Westcon-Comstor, Bracknell

Project Size

15,000 sq ft

Duration

15 weeks

Value

£745k

The Project

Orion worked directly with our client on this 15,000 Sq Ft office refurbishment. This was a two phase project which included workplace consultancy, creative design, new furniture, M&E design and full Cat B fit out.

Phase one included the design of the west side of the Ground Floor, followed by the fit out and installation of new furniture.

Phase two included the strip out, reconfiguration, fit out and the installation of the new furniture to the east side of the Ground Floor ready for occupation.

The creative design included: new partitions and floor layout, full M&E design, new kitchens, breakout areas, meeting rooms, sound booths and new office furniture.

Orion Group Project - Bracknell
Orion Group Project - Bracknell

“I can only praise the whole team on the design and build experience. Jointly we set out to create a great working environment for Westcon’s staff in the new Bracknell Office, creating a fun, well designed office space, that encompasses the brand and delivers the desired functional requirements.

There is no doubt that Orion have exceeded our expectations.

With any large project there are going to be difficulties to overcome and the mark of a great company to work with, is how well they respond to these challenges. I personally had an excellent working relationship with Orion on this project, their problem solving, communication, responsiveness and knowledge gave me great confidence in their ability to achieve the outcome we wanted. Not only that, but the project was also completed on schedule and the staff love it!

Thank you for creating a great office design that can be enjoyed for many years.”

CEO
Westcon Comstor